Modular desalination solutions

Water available where you need it, when you need it

Compact desalination plants designed to respond quickly, reliably and efficiently to temporary or permanent water supply needs.

From hotels and industrial facilities to agriculture, municipalities and emergency operations, TEDAGUA designs modular solutions tailored to the flow, quality and timeline of each project.

+500

projects delivered

+40

countries reached

50–5,000

m³/day capacity range

TEDAGUA portable desalination plant in operation
Integral engineering and execution
International experience
Solutions adapted to each sector
Response capacity in critical projects
+30
years of experience
+500
international projects
+40
countries
50-5,000
m³/day

A solution ready to respond

TEDAGUA's compact plants combine rapid deployment, operational efficiency and adaptability to solve water needs in very different contexts.

Availability

Stable water production in locations with limited resources or insufficient infrastructure.

Speed

Solutions designed to reduce manufacturing, installation and commissioning times.

Reliability

Equipment and processes backed by TEDAGUA's experience in large water infrastructure.

Efficiency

Design focused on optimizing energy consumption, operation and maintenance.

Modularity

Adaptable capacity according to flow, input quality and demand evolution.

Support

Engineering, supply, commissioning and technical support from a single team.

TEDAGUA technical team commissioning a portable plant

50–5000

m³/día

RO

Technology

24/7

Continuous operation

Compact technology. Large-scale capacity.

Each solution is configured to respond to actual project conditions: input water, required quality, available space, energy consumption and deployment speed.

See how it works

A solution for every water need

Select your sector and discover how to adapt a compact plant to your operational needs.

Hotels and resorts: water treatment application

Guarantee water supply and quality in destinations with water stress, seasonality or limited access to public networks.

Typical needs:

  • Guest consumption
  • Irrigation and green areas
  • Pools and services
  • Extensions or new openings
Solutions for hotels

+40

Países

100%

Integral

More than a compact plant

TEDAGUA combines treatment technology, specialized engineering and execution capacity to deliver reliable solutions in demanding environments.

1

Specialized experience

Accumulated technical knowledge in desalination, water treatment and hydraulic infrastructure.

2

Comprehensive capacity

Design, manufacturing, installation, commissioning and technical assistance.

3

Backing of a large group

Operational strength and international capacity backed by Grupo Cobra.

4

Project adaptation

Configuration according to flow, water quality, space, available energy and timeline.

A configuration for every project

We select the right solution based on demand, end use, input water quality and operating conditions.

Compact S

Up to 100 m³/day

Uso recomendado

Hotels, small facilities, agriculture and temporary services.

Features

  • Compact format
  • Quick installation
  • Simple operation
  • Scalable through modules

Compact M

Up to 500 m³/day

Uso recomendado

Industry, small municipalities, agribusiness and supply reinforcement.

Features

  • Higher capacity
  • Flexible configuration
  • Pretreatment integration
  • Remote monitoring ready

Compact L

Up to 2,000 m³/day

Uso recomendado

Municipalities, large complexes, industrial operations and large-scale emergencies.

Features

  • Modular architecture
  • High availability
  • Transportable solution
  • Ready for continuous operation

⚠️ Capacities are indicative. Each solution is configured according to actual project conditions.

From need to produced water

01

We analyze the need

Flow, use, required quality, urgency and location.

02

We define the solution

Technical configuration, capacity, pretreatment and format.

03

We manufacture and install

Modular preparation, transport, assembly and connection.

04

We commission

Testing, training, support and operational guidance.

Experience that builds trust

Portable Desalination Plants — La Palma

Emergency response

Portable Desalination Plants — La Palma

After the Cumbre Vieja volcanic eruption, two portable plants were commissioned in just 17 days to restore irrigation water supply to 600 ha of affected crops.

Capacity 5,600 m³/day
Commissioning time 17 days
End use Agricultural
View project on tedagua.com
Escombreras Desalination Plant

Strategic infrastructure

Escombreras Desalination Plant

One of the most important water supply infrastructures in the Murcia Region, supplying over 300,000 inhabitants across 20 municipalities via reverse osmosis.

Capacity 63,000 m³/day
Population served 300,000 inh.
End use Drinking water
View project on tedagua.com
Desalination Plant for Spence Mine

Industry and mining

Desalination Plant for Spence Mine

Concession project for BHP Billiton in Chile: seawater desalination with a 154 km pipeline and 3 pumping stations to overcome elevation changes exceeding 2,000 m.

Capacity 86,400 m³/day
O&M period 20 years
Country Chile
View project on tedagua.com

Discover the range of compact plants

Check capacities, configurations and applications in our technical brochure.

Download brochure

PDF • 2.5 MB

Tell us about your water needs

Complete the form and our team will study the most suitable configuration for your project.

Basic information
Project details

We'll respond within 24 hours

Your water needs can start to be resolved today

Talk to our team and find a solution adapted to the flow, sector and timeline of your project.

info@tedagua.com

info@tedagua.com

Lun - Vie: 9:00 - 18:00